Three-Phase and Fast Charger Installation in Maitland

Your three-phase EV charger assessed, installed, and certified by local Maitland electricians.

0400 167 468

1,500+

EV Charger Jobs

18

Years Experience

Customer Review Icon
Local Business Icon

Your 22kW Three-Phase EV Charger, Installed and Certified

A standard wall outlet delivers around 2.4kW. Based on average Tesla Model Y consumption of around 15kWh per 100km, that is roughly 16km of range per hour. A three-phase charger takes that straight to 22kW.

We assess your three-phase supply, design the circuit, and supply and install the charger for homes across Maitland, with the full scope quoted at a fixed price before anything starts.

Every install is carried out by our licensed, Clean Energy Council accredited electricians and comes with a compliance certificate and workmanship warranty.

We install three-phase chargers and fast DC charging across Maitland and surrounding suburbs. See all the areas we cover.

Three-Phase EV Charger Specialists

Three-phase EV charging involves more than running a heavier cable. Load calculations, switchboard capacity, charger compatibility, and circuit protection all need to be right before a 22kW charger is worth installing.

We spec and install three-phase chargers regularly across a wide range of homes and vehicle types. That experience means we know how to match the charger to the car, size the circuit correctly, and get the job signed off without issues.

Call us today for a quote.

0400 167 468

Three-Phase Power Assessment

We assess your three-phase supply capacity, switchboard, cabling paths, and meter configuration against the demands of a fast charger.

Circuit and Charger Design

Based on the assessment, we specify the right three-phase charger for your property and design the circuit, covering cable sizing, switchboard connection, and mounting position.

Supply, Installation and Compliance

Your three-phase charger is supplied, installed, and wired from the switchboard, with the circuit tested and a compliance certificate covering the full installation.

Warranty, Servicing and Repairs

Our installation work carries a workmanship warranty, and we are available for callouts, servicing, and repairs after the job is complete.

Why Maitland Homeowners Work With Us

Licensed and Accredited

We hold a full electrical contractor’s licence and are Clean Energy Council accredited for EV charger installations.

18 Years Serving Maitland Homeowners

We have been operating in Maitland since 2008 and have completed over 1,500 EV-related jobs in recent years, including three-phase EV chargers.

Compliance Certificate Included

Every install comes with a compliance certificate, signed off by a licensed electrician and issued on the day the job is completed.

Fixed Upfront Pricing

We quote the full job upfront before anything starts. The price you approve is the price on the invoice, with no variations on the day.

EV Charger Specialists

We are licensed electricians, and EV charger installation makes up the bulk of our work. It is not a side job taken on occasionally.

Local Maitland Team

We are a local Maitland team. The people who answer the phone are the same people who turn up to do the job.

What Maitland Homeowners Say

Kimberly S.

Gillieston Heights

5 days ago

Finding someone who actually understood three-phase installation was important to us.

This team clearly had the expertise and experience, and the installation was professional from start to finish.

Excellent work and the charging speed is exactly what we wanted, no regrets about this choice.

Karen T.

Thornton

3 weeks days ago

Our home was only on single phase and we questioned if upgrading to three-phase was worth the expense.

They evaluated the options and installed what was practical for our situation without any unnecessary upselling or drama.

Really appreciate the honest advice and the charging speed improvement is noticeable every single day.

Michelle K.

Aberglasslyn

1 month ago

We questioned whether the upgrade to three-phase was really necessary or just the installer upselling.

They explained the benefits, showed us the testing results, and proved it was the right choice for our situation.

Definitely worth doing and the charging performance proves it clearly, we charge so much faster now.

Robert H.

East Maitland

3 months ago

Our old single-phase setup wasn’t cutting it for our EV charging needs anymore.

James assessed it, recommended three-phase, completed the installation without complications, and tested everything.

Now we’ve got fast reliable charging at home and the service quality was excellent throughout.

Jason L.

Gillieston Heights

5 months ago

We needed professional installation for a three-phase fast charger system and couldn’t trust amateurs.

This team had the knowledge and completed the work to the highest standards throughout.

Excellent outcome and the installation quality was professional from start to finish, exactly what we wanted.

Donna C.

Gillieston Heights

6 months ago

We wanted the fastest charging available without unnecessary complications or over-engineering.

The team recommended what would work best for us, installed it properly, and everything works a treat.

Really happy with how they approached it and the results speak for themselves every single day.

Suburbs in Maitland We Service

We service all suburbs across Maitland, including those listed below.

  • Aberglasslyn
  • Ashtonfield
  • Bolwarra Heights
  • Chisholm
  • East Maitland
  • Gillieston Heights
  • Metford
  • Rutherford
  • Tenambit
  • Thornton

If your suburb is not listed, or you are not sure whether we cover your area, call us at 0400 167 468. We’ll confirm coverage and provide an estimated response time before you decide whether to engage our services.

Frequently Asked Questions

How much does three-phase EV charger installation cost in Maitland?

Three-phase charger installations typically cost between $1000–$1800 for supply and installation across Maitland. The price depends on whether your property already has three-phase power, the distance the cable needs to run from your switchboard to the charger, and the charger model you choose. Older Hunter Valley homes sometimes need switchboard upgrades which add to the cost. Call us with your postcode and we can provide a fixed quote after a site assessment.

How do I know whether I need a 22kW or 11kW charger?

22kW is the most common output for homes with three-phase supply and suits most EVs with a three-phase onboard charger. 11kW applies where the property’s supply capacity or the EV’s onboard charger limits the maximum draw — not all EVs can accept the full 22kW even if the supply is available. The assessment at the start of the job confirms which output is right for your home and car before anything is quoted.

How long does a three-phase charger installation take?

Most three-phase installations are completed in a single visit, though the timeline depends on whether supply upgrades are required. If your switchboard needs modification or three-phase power needs to be extended from the grid, there may be additional work. Get in touch and we can walk you through the timeline for your property.

What does a three-phase EV charger installation involve?

A three-phase installation starts with a supply assessment to confirm three-phase availability and switchboard capacity. From there, we design the circuit and select the charger, covering cable sizing, switchboard connection, and mounting location. Supply and installation happen next, with the circuit tested and a compliance certificate issued covering the full job. If a network upgrade is needed, that’s an additional step we manage for you.

Does a three-phase charger installation meet Australian wiring standards?

Yes. All installation work is carried out to AS/NZS 3000 (Australian wiring rules) and to the network provider’s connection standards for higher-load circuits. The compliance certificate issued at handover is the formal record of this. You get complete confidence that your three-phase installation is safe, certified, and up to code.